(818) 264-1955
Top

Garage Conversion

Turn an underused garage into a legal, permitted living space or ADU — built by a licensed contractor (Lic. #1092628) serving Southern California.

Licensed (Lic. #1092628), bonded, and insured — permitted work, not a shortcut.

Built to code as habitable space so it counts and appraises.

Convert to a full ADU with kitchen and bath for long-term income.

Garage Conversions in Los Angeles

A garage is usually the cheapest square footage you already own. The slab, walls, and roof exist, so converting costs far less per square foot than building new — and California ADU law has made permitting dramatically more straightforward. Hollywood Contractor Corp is a licensed general contractor (CSLB #1092628) converting garages across Los Angeles County, including Burbank, Glendale, Pasadena, and North Hollywood. We confirm feasibility for your address first, then handle plans, permits, insulation, egress, electrical, plumbing, and finishes so the finished room is legal habitable space — not an unpermitted conversion that causes problems at resale or with your insurer. See our new construction services.

Newly completed detached backyard ADU with modern board-and-batten siding in Southern California

What You Can Turn a Garage Into

Once it’s permitted as habitable space, the layout is up to you.

  • A full ADU with kitchen and bathroom
  • A guest suite or in-law unit
  • A home office or studio
  • A gym or hobby workshop
  • A teen or multigenerational suite
  • A rentable unit for ongoing income

What a Legal Conversion Requires

Converting to habitable space means meeting real code requirements — this is why permits matter.

  • Insulation in walls, roof, and slab edge
  • Egress windows and proper ceiling height
  • Upgraded electrical and dedicated circuits
  • Plumbing for kitchen and bathroom
  • Heating and ventilation to code
  • Fire separation from the main dwelling
Completed adu and jadu construction work at Hollywood Contractor Corp
Completed adu and jadu construction work at Hollywood Contractor Corp

How We Convert Your Garage

We handle the design, the city, and the build so the finished space is fully legal.

  • Feasibility check — zoning, setbacks, and parking rules
  • Plans & permits — drawn, submitted, and cleared
  • Slab & envelope — insulate, level, and seal
  • Systems — electrical, plumbing, and HVAC
  • Finishes — flooring, drywall, kitchen, and bath
  • Final inspection — signed off as living space

Garage Conversion Options

From a simple finished room to a fully independent rental unit — we build the version that fits your goals.

  • Full ADU conversion — kitchen, bath, private entry.
  • Junior ADU (JADU) — compact unit under 500 sq ft.
  • Attached garage conversion — integrate with the house.
  • Detached garage conversion — a private backyard unit.
  • Office or studio — finished, insulated workspace.
  • Partial conversion — keep some storage or parking.

Our Garage Conversion Process

Most of the risk in a garage conversion is in the paperwork. We handle that first, then build.

1

Feasibility & Design

We confirm zoning and parking rules, then design a layout that will actually permit.

2

Permits

We submit the plan set and clear city corrections so the space is fully legal.

3

Build Out

Insulation, framing, electrical, plumbing, HVAC, drywall, and finishes.

4

Final Inspection

The city signs off and you have permitted, habitable square footage.

Why Homeowners Choose Hollywood Contractor Corp

An unpermitted conversion can cost you at resale and in insurance. We build them legally so the space counts.

  • Licensed, bonded & insured (Lic. #1092628)
  • Permitted work that appraises and insures
  • We handle zoning, plans & city corrections
  • Honest feasibility check before you spend
  • ADU-ready with kitchen and bath
  • Local crews who know LA & county ADU rules
  • Hundreds of completed LA-area projects
  • Workmanship warranty on every conversion

How Much Does a Garage Conversion Cost?

Garage conversions in Los Angeles typically run $60,000 to $150,000 — the least expensive way to add legal, permitted square footage.

Scope of work Typical LA range What it covers
Basic finished room $40,000 – $70,000 Insulation, drywall, flooring, electrical, and windows. No kitchen or bathroom.
Room with bathroom $70,000 – $110,000 Adds plumbing, a full bathroom, and ventilation.
Full ADU conversion $90,000 – $160,000 Kitchen, bathroom, private entrance, and separate utilities.
Junior ADU (JADU) $50,000 – $100,000 Under 500 sq ft with an efficiency kitchen; may share a bathroom.
Structural / slab work +$5,000 – $25,000 Raising the slab, correcting drainage, or reinforcing the roof.
Design & permits $8,000 – $20,000 Plans, Title 24, and city fees.

Ceiling height is the constraint that catches people out. Habitable space requires a minimum height and plenty of older garages sit close to the line. Lowering a slab or modifying the roof is possible but adds real cost — which is why we measure during feasibility.

Finished Room or Full ADU?

Both are permitted conversions, but they differ enormously in cost, complexity, and what you can do with the result.

Finished room

  • Home office, gym, studio, or playroom
  • No kitchen or bathroom plumbing
  • Considerably lower cost
  • Simpler and faster permitting
  • Cannot be rented as a separate unit

Full ADU

  • Kitchen, bathroom, and private entrance
  • Can be legally rented for income
  • Adds appraisable square footage
  • Higher cost and longer permitting
  • Requires separate utility provisions

If rental income is the goal, only a full ADU achieves it — a finished room cannot be let as a separate dwelling.

Conversion Options Compared

How the realistic conversion routes compare on cost and what they let you do.

Option Best for Expected life Relative cost
Finished room Office, gym, or studio 50+ years $
Junior ADU Smallest budget rental unit 50+ years $$
Full detached ADU conversion Maximum rental value 50+ years $$$
Partial conversion Keeping some storage or parking 50+ years $
Attached conversion Integrating with the main house 50+ years $$

Under current California law, replacement parking generally cannot be required when converting an existing garage to an ADU — though local details still vary, which is what the feasibility check confirms.

What to Expect During the Project

Construction usually takes two to four months, with design and permitting adding two to four months before that.

Stage Typical timing What happens
Feasibility 1–3 weeks Zoning, ceiling height, utilities, and what your jurisdiction will approve.
Design & plans 3–6 weeks Layout, Title 24 compliance, and the permit drawing set.
Permitting 6–16 weeks Submittal and city corrections.
Demolition & prep 1–2 weeks Garage door removed and framed in, slab prepared, envelope opened up.
Rough-in 2–4 weeks Framing, electrical, plumbing, HVAC, and insulation, then inspection.
Finishes & final 4–8 weeks Drywall, flooring, kitchen and bath fit-out, then final inspection.

Done properly, the finished exterior should read as part of the house rather than a filled-in garage opening. That detail is what separates a conversion that adds value from one that visibly does not.

How to Choose a Contractor

Garage conversion work is largely invisible once it is finished, which is exactly why standards vary so widely. A few things reliably separate a proper job from an expensive patch.

Good signs

  • An active CSLB licence you can verify online
  • A written, itemised, fixed-price scope
  • They explain the cause, not just the fix
  • Realistic timelines rather than optimistic ones
  • A workmanship warranty in writing
  • Ceiling height measured during feasibility
  • They confirm your jurisdiction’s ADU rules in writing

Warning signs

  • A quote given without a proper site visit
  • Pressure to sign today for a discount
  • Large cash deposits up front
  • The same solution proposed for every home
  • Vague allowances instead of fixed pricing
  • Unpermitted conversion offered as a cheaper option

Hollywood Contractor Corp holds CSLB licence #1092628 — verify it, and any contractor you are considering, with the California State License Board.


Garage Conversion FAQs

How much does a garage conversion cost in Los Angeles?

Most garage conversions in the LA area run from about $60,000 to $150,000. A simple finished room without plumbing sits at the low end; a full ADU conversion with a kitchen, bathroom, and separate utilities costs more. Because the slab, walls, and roof already exist, it is usually the least expensive way to add legal square footage.

Do I need a permit to convert my garage?

Yes. Converting a garage into habitable space always requires permits. Unpermitted conversions create serious problems at resale, can be flagged by appraisers and insurers, and may have to be reversed. We handle the permitting so the finished space is fully legal.

Do I have to replace the parking I lose?

Under current California ADU law, replacement parking generally cannot be required when you convert an existing garage into an ADU. Local rules still vary in the details, so we confirm the specific requirements for your address during the feasibility check.

How long does a garage conversion take?

Construction typically takes about 2 to 4 months. Design and permitting usually add another 2 to 4 months before that, depending on your jurisdiction’s plan-check timeline.

Can I rent out a converted garage?

Yes, if it is permitted as an ADU with the required kitchen, bathroom, and egress. That is exactly why most of our clients convert — a legal ADU can generate meaningful long-term rental income in the LA market.

Will a garage conversion add value to my home?

A permitted conversion generally adds value, because it adds legal, appraisable square footage and potential rental income. An unpermitted conversion often does the opposite, so permitting is what protects the investment.

Does the ceiling height in my garage work?

Habitable space requires a minimum ceiling height, and many older garages are close to the line. We measure during the feasibility visit. If the height is short, options include lowering the slab or modifying the roof structure — we’ll tell you what’s realistic.

What about the garage door opening?

It gets framed in and finished with a wall, windows, or a door, depending on the design. Done well, the finished exterior reads as part of the house rather than a filled-in garage.

What Our Customers Say

Don’t just take our word for it — here’s what LA-area homeowners say about working with Hollywood Contractor Corp.

Ready to Convert Your Garage?

Let’s check what’s possible at your address. Free feasibility consultation covering zoning, layout, and a realistic budget for a fully permitted conversion.

Call (818) 264-1955




Garage Conversion Across Los Angeles County

Local crews, local permit knowledge. These communities have a dedicated page covering the work we do there.

We serve 34 cities across the greater Los Angeles area. View all service areas →

Call Us Text Us